Building and timber pest in one attendance, each written up separately.
The building component follows AS 4349.1 and the timber pest component AS 4349.3. A timber pest inspection records evidence and conducive conditions present on the day; it neither treats anything nor certifies that a property is free of pests.
0 checkpoints across 0 areas on a standard Riverstone building and pest inspection. We need the property accessible and, on a new build, the builder aware an independent inspector is attending. Anything not complete on the day is recorded as such rather than passed.
Drawn from our handover work here, since these are the conditions a pest inspection also weighs.





New Construction Stage Inspections Seven checks through a Riverstone build, written rather than illustrated.
Pre-Handover (PCI) Inspections The service Riverstone books, and the detailed part of this site.
Defect Investigation Reports One failure, and whether it was a defect or an event.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1, old stock and new alike. Instant online pricing, or talk to the booking team on 1300 471 805.
It changes the moisture history, which is the main driver. Timber that has been wet and dried slowly is more vulnerable than timber that never was, and on a flood affected property that is worth assessing directly.
Because condensate discharging onto the ground beside a wall keeps that ground damp through every warm month. We recorded exactly that at a Riverstone handover.
No. Treatment and the warranty behind it belong to a licensed pest controller, and keeping the two apart keeps the report independent.