Building and timber pest in one attendance, each written up separately.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
NSW Fair Trading
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society The building component follows AS 4349.1 and the timber pest component AS 4349.3. A timber pest inspection records evidence and conducive conditions present on the day; it neither treats anything nor certifies that a property is free of pests.
27 checkpoints across 9 areas on a standard Riverstone building and pest inspection. We need the property accessible and, on a new build, the builder aware an independent inspector is attending. Anything not complete on the day is recorded as such rather than passed.
Drawn from our handover work here, since these are the conditions a pest inspection also weighs.





New Construction Stage Inspections Seven checks through a Riverstone build, written rather than illustrated.
Pre-Handover (PCI) Inspections The service Riverstone books, and the detailed part of this site.
Mould and Moisture Inspections Mould and damp in a Riverstone home investigated, with the likely source and fix.
Dilapidation Reports A dated baseline for your Riverstone home before demolition or civil works nearby. Instant online pricing for Riverstone, or contact the booking team.
It changes the moisture history, which is the main driver. Timber that has been wet and dried slowly is more vulnerable than timber that never was, and on a flood affected property that is worth assessing directly.
Because condensate discharging onto the ground beside a wall keeps that ground damp through every warm month. We recorded exactly that at a Riverstone handover.
No. Treatment and the warranty behind it belong to a licensed pest controller, and keeping the two apart keeps the report independent.